Account for what IFRS 9 requires when expected loss is estimated.
The idea
IFRS 9 replaced the incurred-loss model with an expected credit loss model, so losses are recognised before a default occurs. Stage 1 assets, with no significant increase in credit risk since initial recognition, carry an allowance equal to 12-month expected credit losses. Stage 2 assets, where credit risk has increased significantly (with a rebuttable presumption at 30 days past due), carry lifetime losses. Stage 3 assets are credit-impaired, carry lifetime losses and earn interest on the net carrying amount. 90 days past due is a rebuttable presumption of default. The estimate must be unbiased and probability weighted. It must reflect time value by discounting at the effective interest rate, and use reasonable and supportable information including forecasts. The stage test is relative to origination, not an absolute PD level.
Formulas
Expected credit loss under IFRS 9
ECL = Σ(pᵢ × Lᵢ) ÷ (1 + EIR)ᵗ
- pᵢ
- the probability of scenario i
- Lᵢ
- the loss in scenario i
- EIR
- the effective interest rate
- t
- years until the loss occurs
Probability weighted and discounted at the effective interest rate. Stage 1 uses 12-month default risk; Stages 2 and 3 use lifetime.
A practice question
Which feature distinguishes a Stage 3 asset under IFRS 9 from a Stage 2 asset?
- Stage 3 uses 12-month ECL while Stage 2 uses lifetime ECL, so Stage 3 provisions are smaller.Why not: Reverses the stages: both Stage 2 and 3 use lifetime ECL.
- Stage 3 assets are removed from the balance sheet.Why not: Credit-impaired assets stay on the balance sheet until derecognised or written off.
- Stage 3 estimates are not probability weighted.Why not: All stages use an unbiased, probability-weighted estimate.
- Stage 3 assets are credit-impaired, with interest recognised on the net carrying amount. - correct
Both stages use lifetime ECL; the difference is credit impairment and the basis for interest revenue. Stage 1 and 2 assets earn interest on the gross carrying amount.
A harder one
A loan of USD 100 million has a 12-month PD of 2 percent, a lifetime PD of 9 percent and an LGD of 45 percent. It moves from Stage 1 to Stage 2. Ignoring discounting, the additional allowance to be recognised is:
- USD 4.05 millionWhy not: Gives the full Stage 2 allowance and forgets the 0.90 already held.
- USD 0.90 millionWhy not: Recomputes the 12-month ECL, which is the Stage 1 level.
- USD 3.15 million - correct
- USD 7.00 millionWhy not: Uses the PD difference (7 percent) on the exposure and omits LGD.
Stage 1: 2% x 45% x 100 = 0.90. Stage 2 uses lifetime ECL: 9% x 45% x 100 = 4.05. The increase is 4.05 - 0.90 = 3.15 million.
The hardest tier
A Stage 2 loan could produce a loss at the end of year 2 in one of three scenarios: no loss (probability 55 percent), a loss of USD 5 million (30 percent) or a loss of USD 14 million (15 percent). The effective interest rate is 8 percent. The lifetime expected credit loss is closest to:
- USD 3.60 millionWhy not: Probability weights the loss but does not discount it.
- USD 3.09 million - correct
- USD 5.43 millionWhy not: Gives equal weight to the three scenarios instead of their probabilities.
- USD 3.33 millionWhy not: Discounts for one year instead of the two years until the loss.
Probability-weighted loss = 0.30 x 5 + 0.15 x 14 = 3.60. Discounted two years at 8%: 3.60 / 1.08² = 3.09.
In the app: 6 practice questions on this outcome, spaced review that brings it back before you forget it.
Start free →More in Credit Risk Management
- Outline the main building blocks of a sound lending or financing policy.
- Show why exposure and concentration limits matter and what makes them hard to set.
- Outline how the scope and allocation of a bank's credit facility are handled, and the bank-level policies and steps used to cut credit risk.
- Review the considerations that feed into classifying credit assets.
- Set out what loan loss provisions and loan loss reserves are and how they work.
- Break expected loss into its components, then show how it differs from unexpected loss.
- Outline a workout procedure for loss assets, and weigh the approach of keeping loss assets on the books against that of writing them off.
- Account for the elements that make up credit risk analysis.
- Lay out what makes up a bank's capacity to manage credit risk, and list the questions its board of directors should be asking.